Sunday, 22 November 2009

DUNCAN (D37) block movement

DUNCAN (D37)
A few night shots as she starts to take shape on the slipway at Govan. The shot above is of the three blocks that are currently out on the slip. Sad to think she will be the final Type 45. The original intention was for twelve of these ships, that was cut to eight then cut to six.


The stern block next the the bridge block.

A closer look of the stern block. Good luck to the Govan Team.

3 comments:

  1. cool pics; next block in two week's time
    ReplyDelete
  2. block B due to go to berth Tuesday 8th December
    ReplyDelete
  3. Block B now out on the berth as of 11.30 this am!
    Magic They do well!
    ReplyDelete