
A look over to BAE Scotstoun and two 1000 tonne cranes in the process of turning the stern block of the second Scotstoun built OPV for the Trinidad & Tobago Navy. She is due to be launched in mid June this year. More details nearer the time.

A closer look at the block.
0 comments:
Post a Comment